Texas generally requires a permit and approved plan to construct, alter, repair, extend, or operate an OSSF, subject to stated exemptions and local administration.
Applicability, timing, evidence, and source
Applicability
Texas OSSF work or operation unless a stated permitting exemption applies.
Audience: Texas rural property owner
System types: on-site sewage facility (OSSF)
Conditions: The activity is construction, alteration, repair, extension, or operation of an OSSF.; No applicable permitting exemption applies.
Local check required. A local authority may affect whether or how this proposition applies.
Exceptions
- An OSSF may qualify for the 10 acre rule exemption if all stated conditions are met.
- Certain emergency repairs may be permit-exempt but have a 72-hour written reporting condition.
Supporting evidence
A permit and approved plan are required to construct, alter, repair, extend, and operate an OSSF. TCEQ is not often the OSSF permitting authority. If you are applying for an OSSF within TCEQ jurisdiction, you may use this application and submit to your TCEQ Regional Office’s OSSF Program. What are some tips I can follow if my OSSF is failing or when I have an OSSF installed. ## Is a permit always required? A permit is required to construct, install, alter, extend, or repair an OSSF. Always check with your local permitting authority . Local permitting programs can be more stringent than State minimums. An OSSF may be exempt from permitting if it complies with all other requirements, including planning, construction, and installation standards of 30 TAC 285 AND meets the “10 acre rule”: - the property receives a site evaluation conducted by a TCEQ licensed Site Evaluator or a Professional Engineer (PE), - serves a single family dwelling on a tract of land that is 10 acres or larger, - is not causing a nuisance or polluting groundwater, - all parts of the OSSF are at least 100 feet from the property line, - the effluent is disposed of on the property, AND - the single family dwelling is the only dwelling located on the tract of land. A permit is also not required for emergency repairs (replacing tank lids, inlet and outlet devices, repairing risers and riser caps, repairing or replacing disinfection devices, repairing damaged drip irrigation tubing, repair of solid lines, and ETC.), but they must be reported to the permitting authority in writing within 72 hours after repairs have begun. Emergency repairs are defined in 30 TAC Subchapter D, 285.35